Notes
-Böhler TC-124D
-Crawler drilling rig for deep hole hammer drilling
-year of construction 1995
-operating hours 8.300h
-drilling hours 5.759h
-drill bits diameter from 85mm-140mm
-2 x diesel engine
-8 cylinder Deutz KHD-BF8L513 with 210kW/286HP compressor
-6 cylinder Deutz KHD-F6L912 with 60kW/82HP hydraulic power unit
-6 boring bars per piece approx. 5,30 meter long.
( each drill rod -dust extraction Herding Hy A30J
-compressor GHH-CF 1000 H
-rotary motor AD45l-32 with 2700 Nm torque
-drilling arm HB 450
-6 boring bars approx.5,30 m. per bar
-operating weight approx. 18.000kg
-German machine from first hand
-N: 105
-very good machine, was in use until the end